Use and Care Manual
3
Glazing
Glazing
Glazing
Glazing
Glazing
Assembly course gable
(see also description from p.12 on)
(View from the outside)
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Floor prole Pos.1.1
Frame of doors right with
hinge borings Pos.1.7
Frame of doors left
Pos.1.6
Tallow-drop srew 4,2x13 Pos.12 (screw down only
after installation of door = (alignment possibility)
*Rose *Orchidee
730 x 728 1048 x 728
Crossbeam Pos.1.9 Crossbeam Pos.1.9
Frame of doors, top
Pos.1.8
Verge ashing pro
-
le right Pos.1.4
Verge ashing pro-
le , left Pos.1.5
Edge stay bars, left Pos.1.3
Edge stay bars, right Pos.1.2
View from inside
Connection sheet
Pos.2
Tallow-drop screw
4,2x13
Screw M6x12
+ nut
Detach edge stay bars on angle bracket
Glazing
Step 7
Only back wall gable!
Connection
sheet Pos.3
Cross-
beam Pos
(Inside view)
Attention! Introduce necessary screws
M6x12 in prole nut before assembly (at
Pos.1.8 and 1.9)
Groove on top!
Borings for door
locking device
angle bracket Pos.1
Crossbeam
Pos.1.9 to
screw down
with tallow-
drop screws
4,8x45 at both
sides
Screws M6 can also inserted later with
every prole with PVC-gliders.
Connect crossbeam with connection
sheets and inserted screws M6x12 and
nuts M12.*