Use and Care Manual
4
Assembly course eaves and skylight
Step 8 Step 9
Step 10
Step 11
Step 12
Step 13
for ex. back
wall gable
Floor prole Pos.2.1 to push
on angle bracket
insert lateral glazings
Insert grooves Pos.2.2
Insert lateral stay bars Pos.2.3 at top into grooved prole
and at bottom into the oor prole. Push straight on up to
glazing and "thread" pane.
Screw down ridge and grooved
proles at gable with end plate
Pos.4 (raised countersunk head
screw 4,2x13)
Front gable to assemble the
same way later!
Support ends
or let hold up
Insert skylight
glazing at both
sides
Ridge prole Pos.3.3
lateral stay bars
enlarged!