Product Manual

Installation &
Operating Instructions
New Machine Setup
1. Unpack Unit: Inspect the nLite HydroPower system and all components.
Read warnings and operating manual.
2. Inspection & Scope of Delivery: Refer to above illustration; perform visual
inspection and take inventory of the following items that should be shipped
with the system, then test system for functionality:
a. TDS Meter (powers on/off).
b. FastLock
TM
Opening Lever (yellow) – Depress lever, rotate in a
counterclockwise direction and remove top cap assembly
(see page 11 for more details).
c. Resin Bag(s) installed in unit.
i. HP06T series – One Bag
ii. HP12C,T series – Two Bags
iii. HP24C,T series – Four Bags
d. Quick Connect ttings installed on unit.
e. Cart, wheels and tank clamp system (if purchased with a cart).
ungerglobal.com
9