Specifications
Model UT90B: OPERATING MANUAL
15
Note
z  To measure online capacity, please turn off
power of the circuit and discharge all
capacitors.
z  Open-circuit voltage of continuity
measurement is about 3V.
z  When continuity testing has been
completed, disconnect the connection
between the testing leads and the circuit
under test.
F. Built-in Power Deficiency Charge (see
figure 8)
Warning
To avoid damage to the Meter, please do not
attempt changeover the rotary range during
charge.
The ways of charge as follows:
1. 220 V
 Power charge.
 Insert the red test lead into the VΩ
 terminal and the black test lead into the
 COM terminal, set the rotary range to 230
 V
 MAX position, then insert the test
 leads into the 220 V
 Power plug to start
 the charge.
2. 9-12
 low voltage power charge.
 Insert the red test lead into the VΩ
 terminal and the black test lead into the
 COM terminal, set the rotary range to 9-
 12
 position, then insert the test leads










