Installation & Assembly
Tools: #2 Philips or Robertson driver & hammer (nail gun optional)
Before Assembly: Please check all components with content list
STEP 1. Assemble Planter Sides
• Insert 6x Side Slats (A) into slot in Rail (C)
• Slide a 2
nd
Rail (C) over free end of slats
• Repeat above directions to assemble other 3 sides
NOTE: tight fitting slats can be eased by rubbing ends with candle wax
STEP 2. Attach Planter Posts
• Stand planter side, centered, between 2x Posts (D)
• Put 2x spacer blocks under planter side to create bottom spacing as illustrated
• Attach posts using 4-inch screws
Note: posts have 2 heights of pre-drilled holes when viewed from each side. Position
posts so that holes are at identical height when viewed from front
• Repeat Step 2 for 2
nd
set of posts
Package Contents:
(A) Side Slat… 24 (short slats)
(B) Bottom Slat… 6 (long slats)
(C) Rails… 8
(D) Posts… 4
(E) Horizontal Slats…8
(F) Pre-drilled Horizontal Slat …1
(G) Vertical Slats …4
(H) Pre-drilled Vertical Slats…4
Hardware
• 4” screw… 16
• 1 ¼” Screw…7
• ½” Wood Spacer Block… 2
• Trellis Nailing Strips…2
• Nail…80
20" Planter Box with Trellis


