3.5 Installation Overview
The repeater can be
installed by following the basic sequence below:
Repeater set-up
o Check the installation surface structure, flatness and suitability.
o Position the repeater cabinets according to the site drawing(s).
o Fasten the cabinets together according to the mechanical drawing(s).
o Unpack the components/sub-assemblies.
HB cabinet
Electronics compartment components/sub-assemblies
o Install the BMS 12 VDC rectifier module in the BMS mounting shelf.
o Mount the HBE in the electronics compartment.
HPA compartment components (assemblies).
o Install the HPA’s in the HPA compartment.
o Install the HPA 30 VDC rectifier modules in the HPA PSU mounting shelf.
Internal wire/cable connections
o Connect the ground, communications, RF and power wires/cables to the HBE.
External input signal interfaces
o Connect the cable from the S-Band antenna to the S-SAT surge protector.
LB cabinet
Electronics compartment components/sub-assemblies
o Mount the LBE in the electronics compartment.
o Mount the dial-up modem in the electronics compartment (where applicable).
HPA compartment components (assemblies).
o Install the HPA’s in the HPA compartment.
o Install the HPA 30 VDC rectifier modules in the HPA PSU mounting shelf.
Internal wire/cable connections
o Connect the ground, communications, RF and power wires/cables to the LBE.
o Connect the ground, communications and power wire/cables to the dial-up
modem (where applicable).
External input signal interfaces
o Connect the cable from the Ku-Band VSAT antenna to the V SAT surge
protector.
o C
onnect the cable from the GPS antenna to the GPS surge protector.
Communications interface
o Connect the PSTN phone line to the Telco surge protector (where applicable).
Shelter/room alarm connections
o Connect any shelter/room alarm contacts/sensors (where applicable) to the
break out board.