User's Manual

Chapter 4 Commissioning
o The LED’s on the HB HPA’s will flash green and blue alternately as the HPA’s ramp
up to the SysPowerSetp target.
o Once the SysPowerSetp target is reached, the HPA LED’s will be illuminated green.
It should take less than 2 minutes for the HB sub-system to ramp up to full power.
4. Ensure that the SysPowerSetp target is reached by viewing the Cpl1ForwardPwr – see
Figure 4-1
, status window line 10.
o Note: The HBE GUI does not provide any coupler measurements. The combined
(coupler 1) coupler measurements are provided by the LBE GUI.
5. Ensure that the TRMS HB Status LED is illuminated green.
o The TRMS should scan through the channels at a fast rate of approximately 2
seconds per channel.
Figure 4-2 HBE GUI sys Page
SX03-2000
0-01-M01 4-7