User's Manual

Table Of Contents
Page 38
X75 SERIES - Mk3 Controller
INSTALLATION & OPERATING MANUAL
Manual No. x75mk3-11
x75-man-Rev11-0815.indd
13.4 BatteryManagement
The Battery Management page is used to congure, run and review the results of
battery testing.
The testing performed veries that the battery voltage holds up above a specied
voltage for the duration of the test.
Figure21-BatteryManagementWEBApplet(typical)
The controls are as follows:
MinimumVoltage. This is the voltage that will be applied to the rectiers for the
duration of the test. The battery voltage will be monitored and if it falls to within
2% above the minimum voltage, the test will be terminated and be considered to
have failed.
TestTime(mins). The duration that the test should be run for (in minutes).
Daysbetweentests. The number of days between subsequent periodic tests.
Timeofdayfortest. The hour and minute to start the testing. This is usually set
to be an off peak time.
Enable periodicTest checkbox. Check this box to enable automatic periodic
testing to run.
Enablebatterytest. Check this box to enable any form of battery testing. This
control acts as a lock to prevent inadvertent testing.