User's Manual

Chapter 3 Installation
3.7.1 12V Battery
The control
cabinet includes and shelf with custom brackets for mounting the battery. Please
refer to Figure 3-9
, Figure 3-10 or drawings SX03-33000-01-D01 for the mounting position of
the battery.
During the installation procedure, several wires/conductors must be connected to the 12V
battery. Please refer to drawings SX03-30900-02-D06 or SX03-30900-03-D06.
The 12V battery should be installed in the following sequence:
1. Ensure that the battery breaker (BAT CB) is in the OFF position – see Figure 3-11
.
2. Remove the two (2) bolts from the battery terminals and set them aside.
3. Place the battery in the bottom shelf between the brackets. The terminals should face
the left side of the cabinet – see Figure 3-13
.
4. Connect the temperature probe and black 1AWG wire (SX03-33905-02) to the
negative (-) terminal on the battery – see Figure 3-14
. A torque rating of 60 Inch Lbs.
maximum should be used to tighten the bolt.
5. Connect the white 1AWG wire (SX03-33905-01) to the positive (+) terminal on the
battery – see Figure 3-14
. A torque rating of 60 Inch Lbs. maximum should be used
to tighten the bolt.
6. Side the sleeve over the battery’s positive and negative terminals – see Figure 3-15
.
Figure 3-11 BMS Rear Panel
1) BMS Battery Breaker BAT CB
SX03-30000-01-M01
3-19