Install Manual
EVERYTHING YOU NEED FOR A QUICK, PROFESSIONAL INSTALLATION
FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702
|
J-BOX MOUNT
INSTALLATION GUIDE
Orient the J-box Mount to match the mounting method (for L-foot mounting,
see instructions below). Use slots, or other preferred method, to attach the
J-box to the mount using enclosure hardware (not included). The slots on the
J-box mount accommodate up to a 6” x 6” hole pattern.
STEP 1: INSTALL J-BOX
STEP 1
STEP 2
Attach J-box and mount to the rail by placing the hanger over the rail and pressing
mount in place. This can be done either below or to the side of the module. For taller
J-boxes, or thinner modules (32mm – 33mm), mounting to the side of the module is
recommended.
STEP 2: MOUNT J-BOX (RAIL INSTALLATION)
STEP 3
Refer to Flashkit Pro instruction manual on proper flashing and L-foot installation.
Note that an L-foot holding a J-box can be installed directly to the roof deck using a
5/16” x 2” Lag bolt (sold separately). Once L-foot is in place and J-Box is installed on
the mount, center the bracket over the L-foot and slide it down onto the L-foot until the
tabs engage the L-foot slot.
TIPS:
L-FOOT MOUNTING: When mounting to an L-foot, orient the L-foot so that the lag bolt
is downslope from the vertical flange so that J-box mount sits over flashing as much
as possible.
STEP 3: MOUNT J-BOX (L-FOOT INSTALLATION)