Specifications

2-4 Installation
DO NOT install forward incline, backward incline, in-line, or ventilator fans because these types of air
handlers are inadequate and inappropriate for this type of installation. If your contractor has any
questions concerning blower specifications or exhaust system requirements, please contact our Service
Department directly before installation.
The following diagram shows a typical exhaust system layout. Use this as a guideline to proper exhaust
system installation. Although these diagrams just serve as an example, we recommend installation of the
exhaust system by a licensed contractor to meet safety and local code requirements as well as being able
to calculate the correct size blower required for your particular installation.
(1) Exhaust Blower mounted
outside the building
(2) Weatherproof shield
(3) Rigid ducting matching the
diameter of the blower inlet
(4) Shut-off or air-flow gate
(5) Reducer to 4 inches
(6) Flexible, wire-reinforced, industrial
grade rubber hose
(7) On/Off switch
Cart Assembly
Since packaging of this unit may vary from time to time, make sure that you locate the following items
from within the crate or inside of the front door of the system:
(1) Back Panel
(2) Legs (both are identical)
(3) 1/4-20 x 1/2 socket head screws with lock and flat washers (8)
(4) Nuts (4)
(5) Non-locking Casters with nuts (2 - Rear)
(6) Locking Casters with nuts (2 - Front)
(7) 10-32 x 1/4 socket head screws (2) (these serve as guides for the main enclosure)
(8) 10-32 x 3/8 socket head screws with lock and flat washers (2)
(9) Connect to main enclosure
1
2
3
4
5
6
7