Installation Guide

5
1. Pump On/Off:
1st Press - The pump starts.
2nd Press - The pump stops.
2. Light Button:
Operates LED lighting systems. NOT
INCLUDED WITH THIS MODEL.
3. Use Button to decrease air jet speed
while the blower is running. Press &
hold to increase the blower speed, release
pressure at the desired speed.
4. Use Button to increase air jet speed
while the blower is running. Press & hold
to lower the blower speed, release pressure
at the desired speed.
5. Blower On/Off:
1st Press-the blower starts.
2nd Press-the blower stops.
Purge Cycle:
There are two different purges: The first at 30
minutes after the tub is used and the second every
24 hours at the time determined by when power is
turned on at the breaker box.
4 3
5
1
2
Universal TOUCH PLUS
START UP AND OPERATIONAL INSTRUCTIONS
120V/60Hz Variable Blower & On/Off Pump
120V 20A
GROUND FAULT
CIRCUIT INTERRUPTER
CLASS A
JUNCTION BOX
WHITE
BLACK
GREEN
NEUTRAL
VARIABLE BLOWER
SL0-6-75-120/60 > 11A
1HP ON/OFF PUMP 120/60 > 7A
KEYPAD
CONTROL
EVO2-T-CB/L-P1B2/12/3-WD1+VB24
WATER DETECTORS
FOR PUMP
ATTENTION 250 mA MAXIMUM
MAXIMUM LIGHTS
6 CG AIR LT - LED09 LIGHTS
LIGHT CONTROL 9 LED LIGHT
LINE
GROUND
ELECTRICAL
FEEDER
120V/60Hz
INSTALLATION CONTINUED