Operating Instruction

Steps
5 / 6
1
Paste the installation sticker on the wall, and keep the horizontal line parallel with the ground
and the red line 1.4m distance to the ground; drill screw holes on suitable position on the wall
according to the installation method (if use 86-box, then no need to drill holes).
3
2
Connect power cable, network cable and other wires, thread the connected tail line
out the hole.
5
Insert the device upper slot into the hook on support, and align the lower slot with the
limit slice, use hexagonal wrench to tighten the tamper screw in shown direction, to
Move the support to align the holes
on it with that on the wall, and use
(Attention: If the wall has hard
foundation, self-tapping screws shall
be used together with expansion
pipe; if the wall has soft foundation,
use self-tapping screws directly.)
4
Align the socket of tail line with the
interface at device back, use thr
1.4m calibration line
1.4M
Outlet hole
1.4m calibration line
2
3
1
1.4m calibration line
1.4m calibration line