User's Manual
5 / 6
1
Paste hole papers, and keep the horizontal line parallel with the ground and the red line 1.4m
distance to the ground. Drill 4 screw holes on the wall according to the reminder of hole paper,
drill 1 outlet hole according to wiring need. If the wall is hard foundation, use expansion pipe in
the parts to knock into the hole.
3
Move the support (device) to align the 4 holes on it with holes on the wall, and use the
2
Connect power cable, network cable and other wirings.
4 Fix the device, manually adjust device angle to reach the optimal recognition angle.
Steps
Attention: If the wall has hard foundation, self-tapping screws shall be used together with
expansion pipe; if the wall has soft foundation, use self-tapping screws directly.
1.4M
Outlet hole
wall-mouting sticker
1.4m calibration
Installation steps:
1. Please follow the calibration tail to horeizontally paste
this sticker on the wall
2. Please drill holes according to the mark
3. Remove the sticker, and install the device
Wall
wall-mouting sticker
1.4m calibration
Installation steps:
1. Please follow the calibration tail to horeizontally paste
this sticker on the wa ll
2. Please drill holes according to the mark
3. Remove the sticker, and install the device
Fasten the screw