Manual

6 of 9
INSTALLATION
The machine has to be laid in vertical position, on a level surface with sturdiness suitable for the
load. DO NOT OPERATE MACHINE WITHOUT LEVELING FEET IN PLACE! Leveling feet need to
be adjusted down, such that the front casters are raised off the surface of the floor and the unit is
level.
Electric Connection
The electric connection is to be carried out by a skilled electrician, in compliance
with the procedures, state/local codes and the regulation in force in the country of
installa
tion. Make sure that the voltage and the frequency of the equipment are the
same of the identification plate of the machine. Damage to the machine resulting
from incorrect electrical connection will void all warranties.
DO NOT REMOVE OR TAMPER THE PROTECTIONS
AND THE ELECTRICAL AND MECHANICAL SAFETY
DEVICES THAT THE MACHINE IS PROVIDED WITH.
CONTROL PANEL
The control panel is used for the operation of the spiral mixer by the user. In order to operate the control
Start Button
Manuall key selector,
1st, 2nd, or timer mode
selection
Reverse bowl jog Button
Stop Button Timers for first and second
speed.
panel, the Mains Power Switch (left side of the machine) must be
switched on.
Start Button - Begins the mixing operation. Timer(s) must be set or the unit must be in emergency bypass
to start.
Stop Button - Stops the mixing operation independent of the timer(s) and safety switches. Typically used
when the timer(s) are being bypassed and the unit needs to stop and restart for the
remainder of a timed mix or when the unit is to be shut off when the emergency bypass time
has expired.