Use and Care Manual

Initial Firing Procedure
TO BE USED ON INITIAL FIRING
(Searing Station (if equipped) is installed by the manufacturer. DO NOT remove.)
1. Open the pellet hopper lid and check for foreign objects in the hopper.
2. Plug the grill into a three wire, grounded wall outlet.
3. Press the power button to turn the unit on.
DO NOT TOUCH THE AUGER OR THE IGNITOR!
Look to see that the auger is turning. DO NOT TOUCH.
4. Open the hopper lid and check to see that the auger is turning freely -
approximately 2 rpm.
5. Place your ngers over the burnpot and feel the air movement from the
combustion blower. Ignitor will glow within 1 minute.
6. Press the Power Button to turn the unit off.
7. Before replacing the removed components, Clean all items with soap and
water, then rinse and allow to dry. Re-install components.
DO NOT TOUCH THE IGNITOR OR THE AUGER.
PREPARING TO USE YOUR GRILL
Important: You must season the grill before cooking any food on your grill for the rst time. The unit must be
operated at maximum temperature for 1 hour with the lid closed. This allows any oil residue from the manufacturing
process to burn off and also allows the high temperature paint to cure. Avoid placing any items on the unit during
this period as the paint could be permanently damaged.
-8-