Operation and Installation Manual
2
TABLE OF CONTENTS
Keep this manual near boiler and
Retain for future reference
Boiler installation shall be completed by qualied agency. 
NOTICE
Used to address practices not related to personal 
injury.
CAUTION
Indicates a hazardous situation which, if not avoided, 
could result in minor or moderate injury.
! 
 WARNING
Indicates a hazardous situation which, if not avoided, 
could result in death or serious injury.
! 
DANGER
Indicates a hazardous situation which, if not 
avoided, WILL result in death or serious injury
! 
This is the safety alert symbol. Symbol alerts you to 
potential personal injury hazards. Obey all safety messages 
following this symbol to avoid possible injury or death.
Become familiar with symbols identifying potential 
hazards.
Keep boiler area clear and free from combustible 
materials, gasoline and other ammable vapors and 
liquids.
DO NOT obstruct air openings to boiler room.
To the owner: Installation and service of this boiler must 
be performed by qualied installer.
To the installer: Leave all instructions with boiler for 
future reference.
Installation in Commonwealth of Massachusetts must be 
performed by Licensed Plumber or Licensed Gas Fitter.
 WARNING
Modication, substitution or elimination of factory 
equipped, supplied or specied components could 
result in death or serious injury.
! 
 WARNING
All boiler and venting installations shall be done 
by qualied agency and in accordance with 
appropriate Manufacturer’s Installation, Operation 
and Maintenance Manual.  Installing or venting boiler 
or any other appliance with improper methods or 
materials could result in serious injury or death due 
to re or to asphyxiation from poisonous gases such 
as carbon monoxide which is odorless and invisible.
! 
Dimensions ................................................................................................................... 3
Boiler Ratings & Capacities............................................................................................ 4
Introduction .................................................................................................................. 5
Ventilation & Combustion Air ........................................................................................ 6
Connecting Supply And Return Piping ........................................................................... 9
System Piping ............................................................................................................. 13
Venting System Inspection & Installation.....................................................................16
Oil Tank And Piping ..................................................................................................... 17
Electrical Wiring .......................................................................................................... 18
Operating Instructions ................................................................................................ 23










