Installation Guide

EXISTING CONSTRUCTION (JOIST/ABOVE CEILING ACCESS APPLICATION) INSTALLATION
INSTRUCTIONS
5.
Place
two
clips (BB) along
the
bottom
edge
of
each
side
of
the housing (A). Place the housing (A) into the
opening, then
mount
the housing (A)
to
the joist.
Note: The clips (BB) will ensure the bottom edge
of
the
housing (A)
is
flush with
the
ceiling board.
Hardware Used
eclip
~
x4
6.
Use long
screws
(AA) to
screw
the housing (A) directly
to the
joist
using keyhole
mounting
tab
holes
or
holes
on
the
inside
of
the housing (A). Choose the side
that
best
works
for
the
installation area. One side
of
the
housing
(A)
has
a foam insert. Remove
and
discard this foam
insert
when
choosing
that
side.
Note: The bottom edge
of
the housing (A)
must
be flush
with the finished ceiling.
Hardware Used
Long Screw
(f)
l))))
I
II
I))
l
II
1))
I l
11)
1
llUJ;>
x 3
or
4
7. Secure
the
hanger
bars (C):
a. Extend
two
hanger
bars
(C) to
the
joist.
b.
Drive
two
long
screws
(AA) into
joist
at
the
top
of
both keyholes.
c. Tighten two long
screws
(AA) securely.
Hardware Used
Long
Screw
(f)lllDll
)))))
)))
)))
)
lll)l
))
)]>
x2
Proceed to Step 12 (Page 15).
12
foam-(~)
~
UTILI
TECH"
J
Lowes .com
\:1
- ·-