Installation Guide
NEW CONSTRUCTION INSTALLATION INSTRUCTIONS
4. Secure the hanger bars (C):
a. Extend two hanger bars (C)
to
the joist.
b.
Drive two long screws (AA) into joist at the top
of
both keyholes.
c.
Tighten two long screws (AA) securely.
Hardware Used
e Long Screw
€)1JDJ)jl))))j)))\j))))l))Dl>
x 2
Proceed to Step 7 (Page 9).
5.
Insert four hanger bars (C) to the housing (A).
6. Secure the hanger bars (C):
a.
Extend four hanger bars (C) to the joist.
b.
Mark the joist at the keyhole slots
of
four hanger
bars (C).
c.
Drive four long screws (AA) into joist at the top
of
four keyhole marks.
d.
Place four hanger bars (C) onto four long screws
(AA), then tighten four long screws (AA) securely.
Hardware Used
e Long Screw
Gjll
))l))
)))
Ill))
Ill
I))
Ill
l))PJ>
x4
8
•
~
UTILI
TECH"
J
Lowes .com
\:1
-·-