User guide

page 92 of 102
Tighten the llister head screws (L) of the
connection fasteners (Q) with a Torx driver
T20.
Close the hinged covers.
Replace diaphragms and valves of the opposite side of
the pump in the same way.
Feed the PTFE hose into the inlet of the
exhaust vapor condenser. Mount the con-
denser with the counter holder (Torx screws
T10) to the pump. Fasten union nut.
Check the overpressure safety relief device
at the exhaust waste vapor condenser.
If necessary, pull off the old pressure relief
valve and install the new one. Check for
correct position of the PTFE-foil under the
pressure relief valve.
Assemble catchpots (9) with joint clips.
Put head cover cowling on.
Slide the head cover cowling in the grooves
of the caps (I) and under the connection
fasteners (Q).
Install the washers. Use a Torx driver T20 to
attach the 4 screws holding the head cover
cowling.