Instruction Manual

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. Manual-no.: 999084 / 05/10/2009
page 40 of 46
If the pump does not achieve the ultimate pressure:
In case the diaphragms and valves have been replaced, a run-in period of several
hours is required before the pump achieves its ultimate vacuum.
If all pump heads achieve a vacuum below 120 mbar but pump does not achieve the
ultimate total pressure:
Check hose connectors between pump heads and manifolds for leaks. If necessary
recheck pump chamber.
Assembling the pump at the pump support and on the base plate:
Tighten union nuts first by hand and then tighten one full
turn using open ended wrench (w/f 17).
PC 600 LAN
Assemble pump at pump support. Support pump appropriately.
Screw in at each case two socket head screws at the rear and the front of the pump with hex key size
5. Pay attention to washers.
Position pump with pump support on the base plate and tighten the four hexagon nuts on the feet of the
pump support with an open-ended wrench w/f 10.
PC 500/600 LAN
Screw controller to holding plate.
Using hex key size 7 fix socket head screw at rear of controller.
Reassemble connections at controller.
Reconnect hose to the inlet of the condenser and tighten
union nut.
Use open-ended wrench to reconnect hose to elbow fitting.