Technical data

16 Installation and maintenance manual atmoCRAFT
2
3
1
Fig. 4.11 Fitting the intermediate plate and side plates
Fix one side plate (1) to the baseframe front and back
with two screws.
Screw the intermediate plate (2) in front of the boiler.
The intermediate plate is placed on the brackets and
screwed in position in the lower area with four screws.
Fix the other side plate (3) to the baseframe front and
back with two screws.
Fix the side plates to the intermediate plate at the top
with screws.
2
1
Fig. 4.12 Fitting the cross-beam
• Insert the projections (1) on the cross-beam (2) into
the openings in the side plates and screw the cross-
beam to the side plates left and right using two self-
tapping screws on each.
1
2
3
Fig. 4.13 Mounting the electronic box
Now fit the electronic box (1).
Push the box onto the holders (2) on the beam and fix
the box with the retaining straps (3).
1
Fig. 4.14 Fitting the STL
Fit the safety temperature limiter (STL) (1) onto the
cross-beam on the left next to the electronic box.
Connect the STL to the plug sockets provided in the
electronic box.
4 Assembly