Technical data

18 Installation and maintenance manual atmoCRAFT
4.7 Connection of the electrical cable
Fig. 4.19 Connecting the gas valves and the STL
Connect the connection cable to the electronic box as
shown in the electrical schematic drawing, see 5.4.3
and 5.4.4.
4.8 Completing the boiler
1
2
4
5
3
3
Fig. 4.20 Fitting the back wall plate
Hang the back wall plate (1) into the receptacle in the
side plates and secure it with one self-tapping screw
(2) on the left and right hand sides.
Insert the braces (3) of the additional back wall plates
(4) and (5) into the back wall and screw both plates in
position.
Note!
Make sure that all the plates are securely
screwed together.
1
Fig. 4.21 Fitting the plinth adaptor
Hang the plinth adaptor (1) into the lateral receptacles
in the side pieces.
Fig. 4.22 Placing the cover of the electronic box in position
Push the cover over the electronic box so that it clicks
into place on the projection on the cross-beam.
4 Assembly