Specifications
4.4.1
Open
flued
aPPliance
Unpack
boiler
from
carton
and
remove
side
oarieis las
in
8.1'1.),
lint
arrestor
(as in 8'2'2)
inO
pait
ing
aids
as
well
as
plastic caps.from
the ionneciions.
Insert
the
appliance
wltn
tne
connection
tubes
downwards
into
the
com-
oiession
unions
of
the
service
cocks
and
hang
it on to
the
bolts(1)
and
fasten
screws
(10)'
Fasten
compression
unions
(6)
and
union
nuts
ig),
using
thb
attached
washers
(1
1)'
4.4.2
Balanced
f
lued
aPPliance
Unoack
boiler
from
carton
and
remove
side
Janels
(as
in 8.1.1
.) and
packing
aids
as
wellas
blastic
baps
from
the
connections.
Fit the
flue
buct
(20)
irtitn
tne
2 sheet
metal screws
(22) to
the t;le6copic
duct
(16)
of
the
terminal/duct
assemblY.
Insert
the
appliance
with
the
connection
tubes
downward
iirio
the
compression
unions
of
the
service
cocks
and
hang
it
on
to the
threaded
bolts
of
the
wall
case
(1),
fig.
14.
Fasten
nuts,
compression
unions
(6,
fig.
13) and
union
nuts
is,
iig.
13)
using
the
attached
washers
(11,fig.13).
20
21
1 Fixing
bolts
16
Telescopic
duct
1 9,
22 Sheet
metal
screw
20
Flue
duct
2'l
Flue
bend
Fig.
14
12