Specifications

i
9.2 Sheet
2:
Check
Electricity
Supply
IMPORTANT:
The
preliminary
Electrical System Checks as contained
in the B.G.C. multimeter in-
struction
book are the
first
electrical checks
lo
be canied
out during a fault finding
procedure.
On
completion of
the service/fault
finding
task
which has required the
breaking
and remakirtg of
electrical
connections then
the
checks
-
A.
Earth
Continuity,
C. Polarity and D. Resistance
to
Earth
-
must be repeated.
Preliminary Electlical
System Checks
according
to Instructions
for British Gas
Multimeter.
Push
Main Switch
into
posilion
l.
Replace faulty Neon
and refil Main
Switch Cover.
Replace farlty P.C.B.
with Main
Switch.
ReI. to note 1.
48