User's Manual
-Confidential-
Valerann R&D
1
Valerann Smart road system – User manual
REV01.1
1. General
a) The following describes the method for installing and operating Valerann’s
Smart road system, comprising of road stud sensors and road-side
communication gateway. This system configurated without the presence of
Valerann’s cloud-based server.
b) The entire system is pre-configured. Therefore, once the devices (i.e. the stud
and gateway) are connected, the system will start running automatically.
c) The protocol applies to AS3100 gateway and AS2200 road stud (see figure 1+2).
2. Procedure:
a) Power-up the road studs by removing the battery-cutoff-magnet at the
bottom of the unit (will be done by Valerann personnel):
b) Install the gateway on near-by pole and connect its power cables
according to “Valerann Gateway - Installation Protocol - REV02”
Figure 2- AS2200 Smart road stud sensor unit
Figure 1- AS3100 - Roadside
communication gateway