Operating instructions
15
Installation Planning
Fan (Blower)
Venting
Confi guration
Gas Line
Routing
Consider visibility of shut-off valve or step-down regulators, etc. when planning gas
line routing.
This unit is supplied with a top outlet and is fi eld convertible to a rear outlet. Plan
routing of vent taking into consideration stove and vent clearances, allowable vent
terminal locations BEFORE cutting a hole in the roof or wall. Avoid penetrating the
wall/roof at structural members.
Allow for and install electrical wiring if there will be a blower to install. Ask the
homeowner if you are not sure.
Vertical
Vent
Termination
Roof
Pitch
Minimum
"H" (feet)
Flat to 7/12 1'
Over 7/12 to
8/12
1.5'
Over 8/12 to
9/12
2’
Over 9/12 to
10/12
2.5’
Over 10/12 to
11/12
3.25’
Over 11/12 to
12/12
4’
Over 12/12 to
14/12
5’
Venting
Packs Contents—Appliance & Castings
The Madrona Stove is supplied in three (3)
cartons.
• In one carton is the engine.
• In a second carton are the casting sides,
the top and the legs.
• In a third carton are the casting front and
base.
Unpack the cartons carefully. We strongly recommend that you
leave the engine sitting on the packaging base in which it came
to avoid damaging the control valve, wires and pipes already
attached to the engine.
Some parts are packed in the cardboard sleeve around the engine;
make sure you take them all out of the packaging. The engine carton
contains a list of all components included in the three cartons. Make
sure you have all the components before you start the installation.
CAUTION
LEAVE THE ENGINE ON ITS
PACKAGING BASE to avoid damage
to the control valve, wires and pipes.