Full Product Manual

B
A
5. Drill the 2 screw holes with a
6mm bit suitable for the wall
surface.
6. Install the anchors(Part #20),
Seal the wall around the nipple
and the anchors with waterproof
silicone.
.
7. After anchor screws have been
installed, affix the Positioning &
Support Brackets (Part #21) using
supplied Screws (Part #19).
Silicone
B
A
21
20 x2PCS
1 9 x2PCS
Note: Before drilling make sure you have the correct drill bit for your shower surface.
8. Hose shearing instructions
a. Grasping the PVC supply line, extend the PVC supply line straight over the shower head outlet.
b. Mark the PVC supply line where it intersects the bottom of the shower head outlet.
c. Shear the excess PVC supply line at the mark.
INSTALLATION INSTRUCTIONS
PH
+
Method 1
- 10 -
Warning: Ensure your shower water
line is not directly behind the drilling
points A and B. Drilling into the water
supply line may cause extensive
damage.
Shear
a
b
c
Line 1