User guide
TRI-PHASE OPERATING™ INSTRUCTIONS
95
17.5 Test Plan Loaded Status Display
TAP NUMBER 1
H VTG: 12,000
X VTG: 208
“START” to RUN TEST
Figure 63.0 Test Plan Loaded Status Display
a. Description: Displays H and X voltages set by test plan test number 1 used for testing the
transformer.
b. Origin: With a test plan loaded in temporary memory, select menu option 1 from the “Test
Plan Loaded Menu”.
c. Action Options: Press “START” to perform test number 1. Press “STOP” to abort the test
and return to the “Main Menu”.
d. Action To Perform: Press “START” to perform test number 1 for this example.