If installed on a concrete slab where no underfloor access or cannot move drain. You may consider the
following option.
- Optional flexible drain hose from plumbing hardware or home improvement store may be used.
Connect one end attaches to the bathtub drain and the other end needs to be attached to the floor
drain by using a transition piece.
- Optional island tub drain may also be used.
- Create a bridge from the bathtub drain to the floor drain only by a certified plumber, as any mistake
can cause leaks.
10. DO NOT SHOWER or MOVE the tub after installation because it will take about 24 hours to get
the silicone sealant to dry.
9. With the tub now set in place, wipe off any adhesive where the tub meets the floor with a wet cloth.
8. Fill the tub with water to the overflow and then drain the tub while inspecting the waste and
overflow connection below the floor for any leaks. Access from below will be necessary for this step.
3. INSTALLATION WITH UNDERFLOOR ACCESS
1. Clean, level and prepare the floor for installation. Place the tub in the exact installed location on
the floor trace the outline of the bathtub with a pencil and mark the drain hole location on the floor.
Move the tub away so that the plumbing can be installed.
2. Turn the bathtub upside down and set it on a non-abrasive mat, blanket, or cardboard to prevent
any scratches on the tub rim.
3. Place a level across the bottom of the tub and adjust the tub feet leveler to touch the level. Then
raise the leveler an additional 1/8" or 3/16" so that the weight of the sub, water, and user are fully
supported by the feet adjuster and not the tub walls.
4. Measure the distance from the drain into the drain pipe on the floor; the drain pipe should extend
approximately 1" above the finish floor. Use a drain adapter (not provided) if necessary.