Owner`s manual
DRAFT
6.1 Verification Overview
To verify the new processors, turn the system on and let the
power-up tests run. Set system parameters. Apply current
ROM and PCS patches with EVUCA. Then save system
parameters, boot the operating system, and run applicable
tests.
To be supplied.
Figure 6–1: Verification Flowchart
6–2 VAX 6000: Installing Model 600 Processors