User Manual

Table Of Contents
APCD-LM048-1.1 21
4 Installation
4.1 Installation Checklist
A successful installation is divided into pre-installation, installation and post-installation stages,
with each stage outlined in the following checklists.
The Pre-Installation Stage Checklist involves the Network Operator as well as the installer.
Table 3 Pre-Installation Stage Checklist
When everything is ready for the installation stage, then the installer performs the following
steps:
Step Discussion
section 4.2.1, Network and
EUM3006 Configuration
The network must be properly configured by the
Network Operator to accept the new modem.
section 4.2.2, Installers Kit
and Information
The installer requires some equipment, tools and
information prior to installing the modem.
section 4.2.3, Verifying the
EUM3006 Components
Ensure that all the needed parts are included.
section 4.2.4, End-Users PC
The end-user’s PC requires an Ethernet Network
Interface to accept the data from the EUM3006.