Operating instructions

First Start-up Vector Control Chassis Type Frequency Converter
476 869 4070 76 J AB-74 Siemens AG
10-2 Operating Instructions SIMOVERT MASTERDRIVES
Parameterizing by
download or
with parameter modules
Connect control cables,
communication cables,
encoder cables and
motor cables
Further start-up and parameterization according to
your specific requirements
Function test
Please connect the remaining control,
communication, encoder and motor cables.
When laying the cables, please observe the
EMC instructions.
After checking the unit and the cabling once
more, power up the line voltage or DC bus
voltage, if you have not already done so, and
perform a function test according to your
parameterization.
It must be ensured that no danger
for persons and equipment can
occur by energizing the power and the
unit. It is recommended not to couple
the driven machine until the function
test has been successfully completed.
See
"Parameterization"
See
"Connecting-up"
and
"Installation in Con-
formance with
EMC Regulations"
Warning: