Fig. 27: Wiring plan, double chamber housing Exd
1 Power supply/Signal output
5.6 Wiring plans, version IP 66/IP 68 , 1 bar
+
-
1
2
Fig. 28: Wire assignment, connection cable
1 br (+) and bl (-) for power supply or to the processing system
2 Screen
5.7 Switch-on phase
After VEGAPULS 62 is connected to power supply or after a
voltage recurrence, the instrument carries out a self-test for
approx. 30 seconds. The following steps are carried out:
l Internal check of the electronics
l Indication of the instrument type, the rmware version as
well as the sensor TAGs (sensor name)
l Output signal jumps briey (approx. 10 seconds) to the set
fault current
Then the corresponding current is transmitted to the cable.
7)
7)
7)
The value corresponds to the actual level as well as to the settings already
carried out, e.g. default setting.
Wiring plan
Wire assignment, connection
cable
Switch-on phase
Connecting to power supply
VEGAPULS 62 - 4 ... 20 mA/HART 33