4x B 2x B1 2x C 2x C1 2x D 4x 6x F 8x A E G 2x G1 4x G2 4x H1 4x J 2 4x K 4x K1 4x M 1x N 4x N1 6x H2 4x L 1x N2 4x
N3 8x P Q 4x 6x Q1 4x Q2 4x Q3 4x Q4 4x Q5 4x Q6 4x R 2x R1 4x R2 4x T 4x U 104x S 4x V 4x S4 Y 60x W 12x M6x15 3 M5x12 M6x10 1 111x 2 32x 5 8 12x 2x 1x 3 48x ST4.
<1> A 4x J 4x A 3 12x M5x12 3 J A 3 3 J 4
<2> B B B1 2x 1 B1 2x 1 P C 2x 1 B P C1 2x B1 Note: This is divided into up and down directions,and the position of the hole refers to the enlarged view.
<3> 2 32x M6x10 B1 C 2 2 C C1 B1 B A C1 B C B1 A A A <4> H1 4x H1 H2 4x A H2 3 3 H1 3 32x H2 H1 H2 M5x12 H2 H1 H2 6 Note: Firstly, Install the screws on the beam, but do not tighten them. After the uprights are tightened, then tighten the screws all. If the hole position is not aligned, move the uprights to adjust the position.
<5> K 4x 4 B 6x 6x K1 4x 7x 7x K C1 K1 K1 K U 104x 4 K K V 3 4x 4x K1 K1 4 K M5x12 K1 B1 ST4.
<6> D L 4x D L D D 1 1x D L 1 12x M6x15 D D D D 1 A D D D 8
<7> E 6x 1 18x M6x15 E E L E 1 E 1 E E 9 E
<8> M 1x M 1 1x 5 2x M6x15 L 1 5 Note: Do not tighten these three screws now, and tighten them after 15 steps are completed.
<9> F F Right 4PCS F Left 4PCS 8x F N3 8x N3 1 1 8x M6x15 <10> N2 4x 1 4x D N2 M6x15 1 D 11 N2
<11> 1 16x M6x15 D F Left 4PCS D F N2 F F 1 1 Right 4PCS Left 4PCS F F F F Right 4PCS Left 4PCS F F Right 4PCS 12 Left 4PCS F Left 4PCS F Right 4PCS
<12> Q Q or R E 6x Y E N R Q1 4x Q Q1 Q2 Q G1 G2 Q Q2 Q1 G G2 Q2 4x G1 G R 2x G2 G1 G1 R G 2x Q Q N 1 G1 4x N N1 G G2 Q2 G1 N1 Q G1 Q1 Q2 R N1 R Q2 N G2 Q N1 G2 4x 1 Q Q Q1 N1 6x N1 Q1 Q Y 12x N G2 Q1 4x 13 G1 Q Q Q2 N 1 10x M6x15 N G1 N1 G N1 G2
Q3 <13> Q1 Q3 4x or Q4 or Q2 D or E Y Q4 4x Note: Y is stuck in the position where the small piece (Q3,Q4) and the large piece (Q1,Q2) overlap. Y 16x Q2 Q1 Q2 Q1 Q4 Q3 Q4 Q3 Q4 Y Y D Q3 Q4 Q4 Q3 Q3 14 Q3 Y Y E Q4 Note: According to the installation order of (Q1,Q3) (Q2,Q4) is the best. There is a small hole on the edge of each sheet of iron. This is only a ctaft hole, not a defect. The small hole is invisible after installation.
Q5 <14> Q3 Q5 4x or Q6 or Q4 D or E Y Q6 4x Note: Y is stuck in the position where the small piece (Q5,Q6) and the large piece (Q3,Q4) overlap. Y 16x Q4 Q3 Q4 Q3 Q6 Q5 Q6 Q5 Q6 Y Y D 15 Q5 Q5 Q6 Q6 Q5 Q5 Q6 Y Y E Note: According to the installation order of (Q3,Q5) (Q4,Q6) is the best. There is a small hole on the edge of each sheet of iron. This is only a ctaft hole, not a defect. The small hole is invisible after installation.
R1 <15> Q5 R1 4x or R2 or Q6 D or E Y R2 4x Note: Y is stuck in the position where the small piece (R1,R2) and the large piece (Q5,Q6) overlap. Y 16x Q6 Q5 Q6 Q5 R2 R1 R2 Y R1 Y D 16 R2 R1 R2 R1 R1 R2 R2 Y R1 Note: According to the installation order of (Q5,R1) (Q6,R2) is the best. There is a small hole on the edge of each sheet of iron. This is only a ctaft hole, not a defect. The small hole is invisible after installation.
<16> R2 Q5 R1 Q3 R2 Q6 Q1 Q4 Q2 17 R R1 Q6 Q4 Q Q5 Q2 Q Q Q3 Q1
<17> T 4x U T U T T T 13 12 11 7 65 10 9 8 43 2 1 T 18 Note: 1. S and T are divided into left and right directions, identification method: take apart the four zippers, and install S/T in a single piece. The iron hook on S passes through the hole on T and hooks on the small hole of the upright. 2.There is no separate Bandage on T, the Bandage has been sewn on S.
<18> S 4x U S U S S 7 65 10 9 8 43 13 12 11 21 S 19
<19> W 12x 8 12x J 8 S 8 or W W J 20 A S