Attention: Do not remove the bindings holding the two extension arms until fully assembled. These are spring-loaded and can cause serious injury if allowed to spring free. Attention: Read this instruction manual carefully and completely before mounting and usage. Keep this manual for future reference. Dear Customer: Congratulations and thank you for buying an awning from us. To enjoy this product for a long time and for your own and the safety of other people please obey the mounting instructions.
HARDWARE J K-1 L K-2 P S 16PCS M T 3PCS N 3PCS D-1 D-2 H 6PCS PARTS A-1 A-2 A-3 B-1 B-2 B-3 C-1 C-2 C-3 E F G 3PCS
S P D-1 D-2 S B-1 P A-2 A-3 A-1 B-3 B-2 H E S S P P J K-1 L C-1 C-3 C-2 J L K-2 F 1
A-1 X1 A-2 X1 A-3 X1 S X8 Connect roller tubes "A-1"&"A-2"&"A-3" A-3 S Insert roller tube "A-1"&"A-2"into "A-3" and connect them with screws "S" S A-3 S Complete the connection to be a complete roller tube "A" A-3 2
C-1 X1 S X4 C-3 X1 C-2 X1 Connect front bars "C-1"&"C-2"&“C-3” C-2 Insert front bar "C-2"&"C-1"into "C-3" and connect them with screws "S" Do not forget to tighten all the screws C-3 S S C-1 C-3 C-2 C-1 S Complete the connection to be a complete front bar "C" C-2 C-3 C-1 3
B-1 X1 B-2 X1 Attention: Do not remove the bindings holding the two extension arms until fully assembled. These are spring-loaded and can cause serious injury if allowed to spring free. L1 L2 L1=450mm L2=400mm B-1 B-2 Before connect parts "B-1" and parts "B-2", please measurement the length of "L" and check nuts on the tube is tighten or not. The length on "B-1" and "B-2" should be change the distance as request before usage. Please adjust the length by yourself.
B-1 X1 B-2 X1 B-3 X1 S X4 D-1 X1 Connect parts "B-1" and "B-2" B-2 B-3 S B-2 S B-1 B-1 B-3 D-1 S B-1 Connect steel square tubes with screws "S" Put the square tube "B-1" into the part "D-1" and tighten the screws on part "D-1" 5
G X3 E X1 F X1 Plastic rope "G" should be through into fabric "E" and flap "F" F Thread the fabric into the groove of the tube E Roller tube A E G Front bar C Thread the "F" into front bar. Thread the "E" into rolle r.
P X2 Install part "P" into the left and right groove of roller tube P P After installation, use a screwdriver to tighten the small screw on part "P" Roll the fabric as the arrow direct by hand 7
J X2 P X2 K-1 X1 K-2 X1 K-2 J K-1 J Put parts ''J'' and ''P'' into left groove of front tube, then tighten the screws on the "P" Put parts ''J'' and ''P'' into right groove of front tube, then tighten the screws on the "P" Insert the plug "K-1" into front tube, a wooden hammer tool can be used to help with installation. Insert the plug "K-2" into front tube, a wooden hammer tool can be used to help with installation.
D-2 X1 D-1 D-2 Insert the roller into the hole of the "D-1" gearbox. Connect roller with part "D-2", and tighten screws.
L X2 Attention: Do not remove the bindings holding the two extension arms until fully assembled. These are spring-loaded and can cause serious injury if allowed to spring free.
Cut off the bandings after the awning is fully assembled.
According to the size of the awning, find a suitable height on the wall. Mark the position of the wall bracket with a marker pen and then drill holes. M X3 N X6 Install the expansion screws to secure the wall bracket firmly to the wall.
T X3 Install the awning on the wall bracket while tightening the fixing screws on the wall bracket.
14
15
16
Enjoy your product! Care and Cleaning 1.For best results, clean the awning with a damp cloth and dry thoroughly. This will help prevent mildew by removing dirt particles that may accumulate. 2.Do not clean with abrasive materials, bleach, or solvents. 3.Store the awning in a dry, sheltered place when not in use. 4.Keep the awning away from fire, extreme heat, freezing conditions, and inclement weather such as rain, hail, sleet, snow, or wind.