VS/VSE English: VS/VSE Deck Mounted Skylight Installation Instructions Español: Instrucciones de instalación para tragaluz VS/VSE montado sobre tablero Français : Instructions d'installation du puits de lumière VS/VSE à cadre intégré monté directement sur la toiture 14°-85° VAS 452198-2011-10
English: Index Español: Índice Français : Index Page 2 Página 2 Installation check list Pages 3-4 Important installation requirements Lista de verificación de instalación Page 2 Liste de vérification préinstallation Pages 3-4 pécifications d'installation imporS tantes Page 5 Warning (VSE only) Páginas 3-4 Requisitos importantes de instalación Page 6 Planning Página 5 Advertencia (VSE solamente) Page 5 Avertissement (VSE seulement) Página 6 Planificación Page 6 Planification Pá
English: Important installation requirements Roof pitch VS/VSE is designed for roof pitches 14°-85° (3:12 - 137:12). In case of roof pitches below 14° (3:12), please contact your VELUX sales company for installation guidelines. Importance of proper installation Satisfactory product performance depends on proper installation. Seller accepts no responsibility whatsoever for failure of an installer to install VELUX® roof windows and skylights in accordance with these installation instructions.
English: Important installation requirements for the USA Español: Requisitos importantes de instalación para los Estados Unidos Français : Spécifications d'installation importantes pour les États-Unis VELUX® series A21 skylights are designed and engineered to be installed with VELUX flashing systems. VELUX flashing systems include VELUX adhesive skylight underlayment in a quantity sufficient to install one skylight of the size for which the flashing system was designed.
VSE English: WARNING Electrical connection It is customer's responsibility: • To contact a qualified electrical installer. • To assure that the electrical installation is adequate and in conformity with National Electrical Code, ANSI/NFPA 70 - latest edition*, and all local codes and ordinances. Failure to do so could result in fire, electrical shock, other serious personal injury or death. Deck mounted skylight VSE is designed for use in both in-reach and out-of-reach places.
English: Clearance around installations Español: Espacio libre alrededor de las instalaciones Français : Dégagement requis autour de l'installation English: Maintain illustrated clearances between skylight frame and critical areas such as valleys, ridges, slope changes and roof-to-wallintersections. When installing skylights side by side within the span 2½" (65 mm) - 12" (300 mm), please refer to VELUX combi-flashing instructions.
ENGLISH: Cut rough opening according to the measurements in the chart. Roof with battens: Clear away battens from rough opening to allow for proper installation of underlayment. H Español: Corte el hueco de acuerdo a las medidas en la tabla. Techo con rastreles: Quite los rastreles del hueco para permitir la correcta instalación de la lámina de soporte. Français : Couper l'ouverture brute selon les dimensions du tableau.
2 English: Remove existing roofing underlayment around the rough opening as shown. 7" 180 mm Español: Retire la lámina de soporte existente de la zona alrededor del hueco tal como se indica. Français : Retirer la membrane de toiture existante autour de l'ouverture brute, tel qu'illustré. 4½" 113 mm 4½" 113 mm English: Mark corners of the rough opening. 3 Español: Marque las esquinas alrededor del hueco. Français : Marquer les coins de l'ouverture brute.
4 3 ⁄8" 10 mm 11⁄4" 30 mm UP ⁄16" 3 4 mm a Skylight size Nails Tamaño del tragaluz Clavos Taille du puits de lumière Clous C01 C04 C06 C08 M04 M06 M08 S01 S06 18 20 22 24 22 24 26 22 26 English: Center skylight over properly cut and framed rough opening using alignment notches as shown (a). Anchor skylight with 1¼" (30 mm) nails provided with the skylight, one nail per prepunched hole in mounting flange. The carbon steel nails are zinc-coated (double hot-dipped).
English: To ensure waterproofing, skylight frames should be completely wrapped in VELUX adhesive skylight underlayment supplied with the flashing. This underlayment must be applied before installing the flashing. 6 Note: If snow accumulation on the roof is likely, waterproofing is achieved by installing a continuous self-adhesive waterproof membrane beneath the roofing material and flashing material.
English: Wrap the side frames and corners of the skylight with VELUX adhesive skylight underlayment and create water-shedding laps over roofing underlayment. Note: Observe the measurements stated. 7 6" 150 mm Español: Envuelva las esquinas y lados del marco del tragaluz con la lámina de soporte autoadhesiva VELUX para crear solapas impermeabilizantes sobre la lámina de soporte del techo. Nota: Respete las medidas especificadas.
English: Installing VELUX adhesive skylight underlayment on roof with battens: Refer to installation instructions included with VELUX adhesive skylight underlayment. Español: Instalación de la lámina de soporte autoadhesiva para tragaluz VELUX en techos con rastreles: Consulte las instrucciones de instalación incluidas con la lámina de soporte autoadhesiva VELUX.
English: You are now ready to install the flashing. If the flashing is not to be installed immediately, reinstall cladding. 10 2 2 Español: Ya puede instalar el tapajuntas. Si no va a instalar el tapajuntas inmediatamente, vuelva a colocar el recubrimiento. Français : Vous êtes maintenant prêt à installer les solins. Si les solins ne sont pas installés immédiatement, réinstaller le revêtement. 1 1 2 English: For flashing information, see instructions supplied with the relevant flashing.
VSE 9"/225 mm ¾"/20 mm by ½"/15 mm 14 VELUX English: Prepare the framing for electrical wiring. All wiring shall be done with factory attached power cable. Wiring of power cable shall be done in accordance with the latest edition of the National Electrical Code (NFPA 70) and all local codes and ordinances. Español: Preparar el marco para el cableado eléctrico. Todo el cableado debe realizarse con el cable de alimentación que viene sujeto de fábrica.
VsE English: A junction box or an outlet box (not provided with skylight) is required for permanent connection of the 20 ft (6 m) skylight power cable. A single phase 120 V, 60 Hz, 40 W branch circuit (continuous electrical feed) is required. The branch circuit must be protected by a 15 A circuit breaker or time delay fuse. The junction or outlet box in which the skylight power cable is terminated must be accessible for inspection after installation is complete.
Français : Information pour le propriétaire occupant Veuillez compléter et remettre au propriétaire occupant. Date : .................................................................................................................................................................................................................................................................. Numéro de produit : ....................................................................................................................