installation instructions

Page 4L123 0516A
8” Transition
Opening 9”
Above Top
of Hood
5” x 16”
Exhaust
Opening
Centerline
of Hood
Vent Holes
Electrical
Centerline
of Hood
¾”
2 ⁄”
9"
16"5"
8" Round 8" Round
9"
9"
Installation Details Continued
8) Turn the hood over on the protective surface. Attach the transition to each dual blower assembly and seal with duct
tape. The transition must t inside the exhaust collar on the blower assembly.
7) Remove the three screws retaining the blower motors. Unplug
and remove the motors, taking care not to damage the blower
wheels. It is not necessary to remove the blower wheels from
the motors.
Warning: Make sure power is o󰀨 and locked at the service disconnecting
means on the service panel during installation.
9) Install an appropriate 1/2” UL listed electrical wire clamp through each motor box electrical opening on the top of the
hood. Install electrical wiring from the service panel to the hood location for each motor box. Consult the connection
diagrams (below) for further details on electrical placement. Support the hood beneath the location where it will hand
and feed the electrical wire(s) through the wire clamp(s). Tighten the wire clamp(s).
Model Volts Amps Hz RPM
CFM
SP@0.0"
Equivalent CFM
CFM
SP@0.1"
CFM
SP@0.2"
CFM
SP@0.3"
Minimum Round
Duct Size
Sones
#
T200 Island Dual 115 4.0 60 1550 550 900 507 471 431 8" (50 in.
2
) 6.0
Two T200 Island Duals 115 7.5 60 1550 1100 1800 1014 942 862 Two 8" (50 in.
2
) 6.0
• BecausetheMagicLung
®
blowerusescentrifugalltrationratherthanconventionalbafeormeshlters,theMagicLung
®
blowercanhandlecookingequipmentwithhighercubicfeetperminute(CFM)requirementsandcandeliverequivalentCFMmuchmore
efcientlythanotherltrationsystems.WhencomparingtheMagicLung
®
withotherblowerunitsmadebyothermanufacturers,usethe“EquivalentCFM”.
#
RatingsinaccordancewiththeStandardTestCodebytheEnergySystemsLaboratoryoftheTexasEngineeringExperimentStation.
6) Remove the shipping tape that is securing the E-Z Clean shields inside the hood. Remove the E-Z Clean shields by
lightly pulling each toward the end of the hood. Gently close the back draft dampers from the top side of the hood. To
remove the blower housings, unsnap the suitcase latches (one on each side of the housing). The housings should be
pulled forward and gently “tipped” to clear the blower wheels and then out of the hood.
Connection Diagram (36”- 54” Widths)
(Note: CILH9 is not available in 36" width.)
550 CFM T200 Dual Blower
(Top View)
VP565 Transition
(Included)
Transition Installed
(Side View)