installation instructions

Page 2L117 0516A
Ducting Do’s and Don’ts
YES
NO
Smooth Duct
Smooth Gradual Turn
Flexible Duct
Sharp Angled Turns
General Requirements
• Observe local codes regarding special duct requirements and placement of duct against combustibles.
• UsingVent-A-Hoodtransitions(backpage)willensurepropere󰀩ciency.
• UsingVent-A-Hoodroofjacksorwalllouvers(backpage)willensurepropere󰀩ciency.
• Where possible, seal joints with duct tape.
• The hood must be ducted to the outdoors without restrictions.
Blower Requirements
• The K250 blower unit requires 7” round duct or equivalent (32.5 square inches).
Blower Duct Dize Sq. Inch Area Vent-A-Hood Transition
K250 3 1/4" x 10" or equivalent 32.5 sq. in. VP521 (Optional)
Ducting Requirements
• NEVER reduce the duct size.
• Donotuseexibleorcorrugatedduct.Thistypeofductwillrestrictairowandreduceperformance.
• Onlyusesmooth,galvanized,metalduct.
• Make the duct run as short and as straight as possible with as few turns as possible.
• Avoid sharp-angled turns. Instead, use smooth, gradual turns such as adjustable elbows or 45 degree
angled turns.
• Forductrunsover20feet,increasetheductdiameterbyoneinchforeverytenfeetofduct.
• A 90 degree elbow is equal to 5 feet of duct.
Termination Requirements
• Airowmustnotberestrictedattheendoftheductrun.
• A wall louver or roof jack is required for each duct run.
• Everywalllouverorroofjackmustincludeagravitydampertopreventbackdrafts.
• Do not use screen wire or spring-loaded doors on wall louvers or roof jacks.
• Donotterminateventingintoanatticorchimney.