Installation Instructions
Page 5L157 1211A
Installation Details Continued
14) From inside the hood, using UL listed wire nuts, attach the "neutral" wire to the white lead, the "hot" wire to the black
lead, and the ground wire to the green lead inside the junction box. Replace the junction box cover.
Warning: Do not operate hood without proper ground connection.
15) Raise the blower plate into the hood rst aligning the ducting (M600 blower only) and then aligning the blower mounting
studs to the holes in the blower plate. Secure the blower assembly with the nuts provided. Connect the motor harness
to the socket next to the power cord on the reverse side of the control housing.
16) To install the bafe lter, hold the lter with the knob facing down and toward the front of the hood. Insert the back of
the lter into the back lter channel with enough force to compress the lter spring. Raise the front of the lter inline
with the front lter channel and slowly release the spring force.
To remove the bafe lter, push the lter knob toward the back lter channel to compress the lter spring. Lower the
front of the lter below the front lter channel and slowly release the spring force.
17) Refer to the Owner and Maintenance Guide for proper hood operation. Test all blower and light functions to ensure
they are operating properly.