“Chattahoochee Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS ZTH WALL MOUNT HOOD Read All Instructions Thoroughly Before Beginning Installation WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: A. Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards, including fire-rated construction.
Ducting Do’s and Don’ts NEVER restrict the duct size. When combining ducts together, the square inch area must reflect the total square inch area of the ducts being combined. Using Vent-A-Hood transitions (back page) will ensure proper efficiency. Blower Duct Size 84. Inch Area Vent-A-Hood Transition Dual (8200) 8” round or equivalent 50” NIA Single and Dual (8100 & B200) 10" round or equivalent 7 VPB62 (Included) Do not use flexible or corrugated duct.
“Overstated Installation Details 1} Read all instructions thoroughly before beginning installation. 2 When installing the ZTH, it is recommended that the bottom edge of the hood be located 30” from the counter top. Duet Cover Shown with duct cover installed (sold separately). 3) IF THE HOOD IS TO BE “BACK VENTED”, PROCEED DIRECTLY TO STEP 4. Pr-install the duct from the outside of the home to the ceiling over the exhaust outlet of the hood. The end of the duct should extend 1” below the ceiling.
“Ventilator Installation Details Continued Remove the hood from the packaging and place the back of the hood on the floor or counter top in front of the wall where it will hang. Remove the blower shield (A) by loosening the two brass screws on the bottom of the shield. To remove the blower housing, UN-snap the suitcase latches (B) (one on each side of the housing). The housing should be pulled forward and gently “tipped” to clear the blower wheel(s) and then out of the hood.
“Yon AM 2 Installation Details Continued FOR BACK VENTING APPLICATIONS ONLY. IF YOU ARE NOT BACK VENTING, PROCEED TO STEP 11. iris necessary to cut duct access hole(s) in the wall prior to installing the hood. To accomplish this, hold the hood on the mounting strip by aligning the channel at the top of the back of the hood over the wood mounting strip on the wall. Place the appropriate elbow(s) on top of the hood in line with the exhaust outlet collar(s). On the wall, trace around the elbow(s).
VENTING “Documentation. ACCESSORIES WALL LOUVER BEE Don 1X FLANGE lo MODEL iM PSI 6"RD VPs21 TURD VP528 87RD VP538 LOW PROFILE ROOF JACK (MAXIMUM 4/12 PITCH) x rr 138° sur RS TEAR MODEL Drv VP539 6° VPS40 7 VPS41 8” BACK VENT ELBOW MODEL, DIM VP35¢ 3 OFFSET KIT.