Unit installation

4
Spigot Locking Clips
(At the base of the spigots)
Unit Locking
Straps
Filter A
Filter B
Spigot Locking Clips
(At the base of the spigots)
B. ASSEMBLY.
1. Fit the four feet to the Base Housing for floor fixing.
2. Insert the Heat Recovery Cube into the Base Section and secure the Cube into position.
3. Pull out the four Spigot Locking Clips.
4. Locate the Fan Blower Units (Item 8) from carton 2 either side of the Electrical Control Box, and the Inlets
(Item 9) into the retaining grooves on the other side of the Base Housing.
Inlet
(Item 9)
Inlet
(Item 9)
Fan blower
unit
(Item 8)
Fan blower
unit
(Item 8)
Electrical control box
Ensure the Fan Units (Item 8) are on either side of the Electrical
Control Box and the Inlets (Item 9 ) are on the opposite side.
5. Locate the Top Housing onto the Base
Housing and secure into position using
the yellow Locking Straps and tighten
the locking screws.
6. Rotate the Blower Units and the Inlets to the most convenient position to suit the direction of the ductwork.
7. Lock the spigots into position by Pushing the yellow Spigot Locking
Clips into the Base Housing, until they are flush.
8. Insert the Air Filters (A and B) into the Top Section.