Installation Instructions
18
.. RV 100 (150) DS
This is to certify that the heat (energy, heat and energy) recovery ventilator Vents Frigate..RV 100
(150) DS has been connected to power mains pursuant to the requirements stated in this User’s
Operation Manual by the electrical engineer:
is recognized serviceable and compliant with the technical parameters.
Stamp of the acceptance inspector Date of production _____________________________
Sold by
Name of the vendor, stamp of the shop __________________________________________________
___________________________________________________________________________________
Sale date _____________________________
Acceptance certicate
The heat (energy) recovery ventilator
VENTS ...RV 100 (150) DS
ACCEPTANCE CERTIFICATE
CONNECTION CERTIFICATE
WARRANTY CARD
Company name:______________________________________________________________________
Electrical engineer name:_______________________________________________________________
Date ______________________ Signature_________________________________________________