Installation Guide

Predrill holes at 1/3 points and between the
bracket and rst baluster from each end
using a 1/8” drill bit.
Follow up with a 7/32” drill bit, drilling
through the top sub rail only (this will allow
screws to snug the top rail tightly).
Finish by gluing the post caps on using a
quality exterior adhesive.
Cut 1 crush block from baluster and glue
centered between posts as shown in the
above diagram.
Secure the top rail to the top sub rail using
four 1-3/4” screws (hardware sold separately).
(NOTE: It may be necessary to countersink
using a 3/8” bit, not more than 1/4” deep.)
www.verandadeck.com
15 16 17
VER-0057-LIT 7/13