Instructions / Assembly
SHADOWBOX
Installation Tips
Planning
• Priortoconstruction,checkwithyourlocalregulatoryagencyforspecialcode
requirementsinyourarea.
• Contactyourutilitysuppliertolocateandmarkundergroundlines.
• Sketchoutthelayoutofyourfenceandcalculatethenumberofpanels,gates,
posts,bracketsandcapsneededforyourproject.
• Carefulplanningandmeasuringofyourfenceprojectisessential,asmoving
postsaftertheconcretesetsisextremelydifficult.Mostyardsarerelativelylevel
andwillallowforafairlysimpleinstallation.Ifyouryardissteeplypitchedor
isveryuneven,besuretoallowfortherequiredmountingheightoftheadjacent
panelwhensettingyourposts.Youmayneedto“stairstep”thepanelsinextreme
cases.Seefig.1.
Digging Post Holes
• Digpostholes10"to12"indiameterand36"to42"deep(dependingonlocal
ordinanceorexpectedfrostdepthinwinter).Seefig.2.
• Checkmeasurementoffence.ActualsizeoftheShadowboxpanelis68-1/2"tallx
66-7/8"wide.Thepanelisdesignedtobemountedbetweenpoststhatare72"
center-to-centerspacing(67"betweenposts).Useastringlinetoensureallpostholes
areinlineandverifyspacingbetweenholes. Double-check all measurements!
Installing Brackets to Posts
• Preparethefencepanelsbyslidingthemountingbracketsintotherails
withtheopenspacefacingouttowardthepicket.Seefig.3.Slidethebracketfullyin
therail.Later,youwillbeabletoslidethebracketoutwardtogetaperfectfitifyour
postopeningisslightlywiderthanthesuggesteddimensionof67".
Setting and Installing Posts and Panels
• Startingwithacorner,mixconcreteinthefirstholepertheinstructionsonthebag.
Mixthoroughlyandinstallthepostintotheholeandtaptheposttotheproperdepth.
Measuretobesureyoucaninstallthefinishedpaneltothepostwithanapproximately
2"gapfromthegroundtothebottomofthepanel.Youalsoneedtoleavea1-1/2"
spacefromthetopofthepaneltothetopofthepost.The1-1/2"spacingallowsthecap
tobeinstalledtothetopofthepostwithoutinterferencewiththetoprail.Seefig.2.
• Installthenextpostasdescribedabove,payingcarefulattentiontothe67"spacing
betweenposts.Itisimportanttodeterminetheheightrequirementformountingthe
nextpanel,asyoumayneedtoleavemorepostabovethegroundtoaccommodate
itsmountingheight(trueifyouareinstallingthefenceonanunevenlandscape).Slide
thepanelwiththebracketsinstalledbetweenpostsandpositionthepaneltothe
desiredheight.Usewoodenblocksorshimstoobtaintheproperspacingfromthe
ground.Usingthesuppliedscrews(fourperbracket),attachthepanelbrackettotheposts.Besuretocenterthefencebracketsonthepost
Oncethepanelisinplace,useadrilltomakeapilotholethroughtherailintothebracketwitha1/8”drillbit.Placescrewthrough
therailintothebrackettoholditinplace.
• Usealeveltoensurethefenceisplumbandthepostsaresquarewiththeground.Bracethepanelandposttoholdthepositionasthe
concretesets(atleastovernight).Continuesettingpostsandinstallingpanelstocompletetheproject.Oncepostsareset,finishpanel
installationbyusingtheprovidedscrewstosecurethefencebrackettothepanel(onescrewoneachside).
• InstallapostcaponeachpostusingaclearPVCcementoranexterioradhesive.
Customer Service 877-463-8379
www.verandavinylfencing.com
Step Method.eps
fig. 1
fig. 2
fig. 3
Thediagramsandinstructionsshownareforillustrationpurposesonlyandarenotmeanttoreplacealicensedprofessional.Anyconstructionoruseoftheproductmustbeinaccordancewithalllocalzoning
and/orbuildingcodes.Theconsumerassumesallrisksandliabilityassociatedwiththeconstructionoruseofthisproduct.Theconsumerorcontractorshouldtakeallnecessarystepstoensurethesafetyofeveryone
involvedintheproject,including,butnotlimitedto,wearingtheappropriatesafetyequipment.EXCEPTASCONTAINEDINTHEWRITTENLIMITEDWARRANTY,THEWARRANTORDOESNOTPROVIDEANY
OTHERWARRANTY,EITHEREXPRESSORIMPLIED,ANDSHALLNOTBELIABLEFORANYDAMAGES,INCLUDINGCONSEQUENTIALDAMAGES.
©2010-2011UniversalForestProducts,Inc.Allrightsreserved.5784ShdbxKittedPanel_10/12


