Instructions / Assembly

©2016 Universal Forest Products, Inc. All rights reserved.
68956 U.S. Hwy 131, White Pigeon, MI 49099 616.365.4201 8775_3/16
www.ufpi.com
Assembling the panel
STEP 1
Install first post with concrete (See “Digging postholes” and fig. 1).
STEP 2
Slide the bottom rail into place at the bottom of the routed
post (fig. 2).
STEP 3
With the bottom rail placed, secure a U-channel to the center of
the post using the provided screws. The U-channel needs to sit
above the bottom rail. Set a screw every 20 inches (fig. 3).
STEP 4
Install the second post into the ground and temporarily secure
into place. Set the bottom rail into the second post and level.
(You will secure the second post with concrete in Step 6.)
Repeat Step 3 to secure a U-channel to the second post (fig. 4).
STEP 5
Slide the first picket into one U-channel so that its perpendicular
to the bottom rail. Slide the bottom of the picket securely into the
channel of the bottom rail. Continue installing each picket. The
pickets feature a tongue-and-groove design so that each picket
fits securely into the one next to it. Repeat with each picket until
panel is complete (fig. 5).
STEP 6
When all pickets have been placed, secure the top rail to the top
routed hole in the first post. Working from one side to the other,
slide the rail over the picket(s). In order to fasten the rail into the
second post, shift the post slightly until the rail can be fitted (fig 6).
Once the rail is securely locked in, the pickets will form a solid
panel.
Backll the second post with concrete and make sure its set
before moving down the fence line. This will always allow one post
to be anchored while each panel section is assembled. To continue
building your fence line, repeat Steps 1-6.
OverlandStep1.ai
OverlandStep3.ai
fig. 2
fig. 3
WOODBRIDGE PRIVACY PANEL ASSEMBLY INSTRUCTIONS, CONTINUED
OverlandStep4.ai
Woodbridge.ai
Woodbridge2.ai
fig. 4
fig. 5
fig. 6