Installation Guide
7
1
1
2
2
Self closing hinges are included with all gates. Make sure hinges are set in 
the proper direction to accommodate either left or right handed gates or 
provide an inside or outside swinging gate. The post that will have the gate 
hinges screwed to it will be the (thick walled) "heavy-duty gate post".
Make sure the fl ange side of the hinge is the side the gate and post will be 
installed onto. 
Release tension of hinges with a standard screwdriver prior to installing. 
Take a fl athead screwdriver and push in the tension adjuster and turn 1/2 turn.
If the gate is not attached to fence sections on both sides, then it is advised to 
install the hinge on the side of the gate with the fence section attached.
Gate Installation
3
3
4
4
Once the concrete has completely set around the gate post(s) (may take 
5-7 days), gates may be hung.
Set the hinges on the gate. Line up the top of hinge with top of top gate 
rail. Line up bottom of bottom hinge with bottom of bottom gate rail. 
Drive two 1
1
⁄
1
⁄
1
4
⁄4⁄
" self-tapping screws through upper hinge into 
gate
gate
 (use 
the inside holes for this step). Repeat for bottom hinge.
Hang gate to post. Make sure the horizontal rails of the gate are at 
the same level as the horizontal rails of the fence panels. Do this 
by either lifting gate by hand, or by inserting temporary spacer 
blocks under the gate to keep gate in place while mounting it to 
gate post.
Gate
Gate Post
Opening Direction
Opening Direction








