Installation Guide

5
Fig. 8
Fig. 9
Fig. 10
Fig. 11
4.
5.
6.
7.
For Picket Panels:
Plumb and level second post and add concrete
according to manufacturer's instructions to top of
post hole (Fig. 8).
Check to ensure the second post is level, then add
panel width plus one half (
1
1
1
2
2
) the width of your post.
This will locate the center of your next hole. Then
dig the third post hole accordingly (Fig. 10).
Repeat process from steps 2 to 5 until all fence
panels and posts have been installed.
Apply glue on inside rim of post tops then attach to
posts (Fig. 11).
For Closed Top/Semi-Privacy Panels:
Add top rail to pickets/boards working from left
to right. Once top rail is engaged with all pickets/
boards, snap top rail into both top post hole routes
(Fig. 9). Plumb and level second post and add
concrete according to manufacturer's instructions
to top of post hole.
Center-to-Center
Post Distance