Installation Guide
6
Insert the top rail into post route holes of fi rst post then guide rail over
picket tops.
Proceed to Step 12.
For open top picket fences follow Step 11 for assembly.
Attach middle rail into left side of post route only then guide rail over
boards. Insert top rail into left post route holes of fi rst post only.
Insert pickets down through top and middle rail.
Note: Scalloped and Arched panels have pickets/boards that are
numbered. Start from left side with the #1 picket/board fi rst.
Insert the top rail into post route holes of fi rst post then guide rail over
picket tops.
Proceed to Step 12.
10
10
c
11
11
a
11
11
b
Insert the completed fence panel into the route holes of the second
fence post. Plumb and level the post and add concrete according to
manufacturers instructions to top of hole.
12
12








