Product Info
Table Of Contents
- About the Document
- Contents
- Table Index
- Figure Index
- 1Introduction
- 2Product Concept
- 3Application Interfaces
- 3.1.General Description
- 3.2.Pin Assignment
- 3.3.Pin Description
- 3.4.Power Supply
- 3.5.Turn on and off Scenarios
- 3.6.VRTC Interface
- 3.7.Power Output
- 3.8.Battery Charge and Management
- 3.9.USB Interface
- 3.10.UART Interfaces
- 3.11.(U)SIM Interfaces
- 3.12.SD Card Interface
- 3.13.GPIO Interfaces
- 3.14.I2C Interfaces
- 3.15.ADC Interfaces
- 3.16.Motor Drive Interface
- 3.17.LCM Interface
- 3.18.Touch Panel Interface
- 3.19.Camera Interfaces
- 3.20.Sensor Interfaces
- 3.21.Audio Interfaces
- 3.22.Emergency Download Interface
- 4Wi-Fi and BT
- 5GNSS
- 6Antenna Interface
- 7Electrical, Reliability and Radio Characteristics
- 8Mechanical Dimensions
- 9Storage, Manufacturing and Packaging
- 10Appendix A References
- 11Appendix B GPRS Coding Schemes
- 12Appendix C GPRS Multi-slot Classes
- 13Appendix D EDGE Modulation and Coding Schemes
Smart LTE Module Series
SC20 Hardware Design
SC20_Hardware_Design Confidential / Released
3-37
/ 122
Figure 7: Turn on the Module Using Keystroke
The turning on scenario is illustrated in the following figure.
Figure 8: Timing of Turning on Module
Make sure that VBAT is stable before pulling down PWRKEY pin. The recommended time between them
is no less than 30ms. PWRKEY pin cannot be pulled down all the time.
NOTE